SIZE | 6,000 sq. ft. |
COST | $2.6 million |
LOCATION | 1710 NE Douglas St. Lee's Summit, MO |
CONTRACT TYPE | Lum Sum |
ARCHITECT | Cyntergy |
MOBank
Formerly Bank of KC.
Exterior features included free-standing entry portal constructed of ACM panels, with decorative canopy of steel and glass.
Bank teller operations and drive through services were offered on the first-floor and the financial offices were located on the second floor.
The project began on October 8, 2012 and was winterized including asphalt paving in 5 weeks. Overall construction duration was 22 weeks.